Book grey structure painting
Post the job and compare prices, or talk to us first. Posting is free, and your number is shown only to the kaarigar you choose.
Post this grey structure painting job Call +92 313 2813999 WhatsApp us
Grey Structure Painting, Karachi rates, 2026
| Job | PKR range | Arrival time | Guarantee |
|---|---|---|---|
| Site survey and quantity take-off1 h | PKR 500 - 1,500 | In the slot you choose | 48-hour rework |
| Putty and primerper sq ft | PKR 12 - 25 | In the slot you choose | 48-hour rework |
| Interior emulsion (labour)per sq ft | PKR 14 - 28 | In the slot you choose | 48-hour rework |
| Exterior weather shield (labour)per sq ft | PKR 20 - 38 | In the slot you choose | 48-hour rework |
| 5 marla grey structure, full paint (labour)5-10 days | PKR 45,000 - 110,000 | Scheduled after the quote | 48-hour rework |
| 10 marla grey structure, full paint (labour)8-15 days | PKR 80,000 - 190,000 | Scheduled after the quote | 48-hour rework |
Typical labour rates 2026. Final price is quoted by the kaarigar before anyone travels.
What grey structure painting in Pakistan covers
The first full paint of a newly built grey structure: putty, primer and finish coats inside and out. The kaarigar confirms the scope on site and sends the price before starting.
Included in the price
- Surface preparation, crack filling and putty
- Primer and the finish coats
- Inside and outside as the quote says
- Covering floors and fittings while working
Not included
- The paint and material unless the quote says with material
- Plaster repair beyond hairline cracks
- Scaffolding for very high elevations
- Polish and enamel on doors and grills unless added
How long it takes
5 to 15 days depending on the size. You pick the day and the slot when you post the job.
Keep this ready
- The covered area in square feet
- The brand and finish you want
- Water and power on site
Grey Structure Painting by city
Common questions
How much does grey structure painting cost in Pakistan?
From PKR 500 at the Karachi rate, less in smaller cities. The table above is the 2026 range for each part of the job. Your kaarigar sends the final price before travelling.
How long does grey structure painting take?
5 to 15 days depending on the size. You choose the day and the slot when you post the job.
What is not included?
The paint and material unless the quote says with material, plaster repair beyond hairline cracks and scaffolding for very high elevations. Anything outside the scope is quoted separately before it is started.
Is there a guarantee?
Yes. If the same fault comes back within 48 hours the kaarigar returns and redoes the labour at no charge.
Grey structure ka paint ka rate kya hai?
Rate PKR 500 se shuru hota hai. Har kaarigar apna rate khud bhejta hai, is liye do teen rate compare karein; jo rate tay ho wohi final hai.
Painter in Pakistan · More services on Mechanics4U
Book grey structure painting
Post the job and compare prices, or talk to us first. Posting is free, and your number is shown only to the kaarigar you choose.
Post this grey structure painting job Call +92 313 2813999 WhatsApp us
Are you a grey structure painting kaarigar in Pakistan?
Customers in Pakistan are searching right now. Register free, get listed on this page and send your own rate.
Free for customers. Your number is shown only to the kaarigar you choose. Same fault back within 48 hours and the labour is free.